The list of Jobs in Hand.
S.No.
Client's Name
Type Of Job
Quantum of Work
(001)
Galadari Cement
Complete Electrical / Instrumentation of 4200 Tons/Day Plant at HUB Complete Project on E & I
(002)
ARAMCO Saudi Arabia Dhahran Project : Corporate Data Centre. The project is one of the most prestigious projects of SAUDI Aramco.
The purpose of the project is to provided absolutely no break power supply to Corporate data
center.

This involves dual supply from the utility company, Standby gererators and UPS systems.
Our Scope of work includes handling of all Switchgear from 13.8 KV to 120V
( Around 1100 units ) From receiving it from the transporting unit to final handing over to the client after all testing and reliability tests..

(003)
Habib Sugar Mill Bus Bar Modification Work. Modification work of Bus Bar of (150x10mm) x 6 Nos. Total Rating of Bus Bars : 9,760 Amperes
(004)
Lucky Cement Limited Installation,Testing & Commissioning of Instruments. Installation,Testing & Commissioning of six nos. Pressure Transmitters on AQC & SP Boilers Steam Lines.
(005)
Lucky Cement Limited Installation,Testing & Commissioning of Ventomatic Packers Project. Complete Project Ventomatic Packers on Line E&F.
(006)
Lucky Cement Limited Electrification Work At Admin Block Electrification, Data Cabling & Telephone Cabling at Admin Block
(007)
WaveTec (Private) Ltd. Design Engineering Services for Data Centre At Ethiopia Designing of Complete Electrical System of Data Centre including Earthing system for Generators, Panels & Digital Equipments
(008)
Afton Chemical Corp. Additive Injection System at 3 PSO Depots Keamari Terminal "A", Shikarpur and MehmoodKot. Supply and Installation of all equipments and others related materials as per supplied BOQ's


The list of executed projects is as bellow.
S.No.
Client's Name Type of Job Quantum of Work
(063)
Lucky Cement Limited Electrification Work At HESCO Grid Station Electrification work of Grid Station in all respect
(062)
Lucky Cement Limited Electrical and Instrumentation Installation, Testing and Commissioning Electrical and Instrumentation Installation, Testing and Commissioning of RDF Project
(061)
Bosicar Water Treatment Plant Consltancy & Installation
Activities
Consultancy of whole project Installation Activities of complete Project
(060)
Pakistan State Oil Co Ltd
E&I activities at LMT Korangi Electrical and Instrumentation of finished product system
(059)
Lucky Cement Limited Waste Heat Recovery Project Complete Project on E & I
(058)
Mehran Spices & Food Industries Electrical Advisory & Installation
Activities
Modification in Exsisting Electrical system, New Plant Electrification.
(057)
Bosicar Refinery Rehabilitation of Electrical System at Hub.
Installation of MCC's, Switchgears and Commisioning of Pumps.

(056)

National Refinery Limited Electrical & Instrumentation Job
of Eight Tanks of FO / HSD / LUB Oil.
Electrification of Loading Pumps, Lighting around the Tanks Area and tank roof lighting, Complete Earthing including Earth Pits, Earthing rods and ECP.
(055)
Lucky Cement Limited
Complete Electrical / Instrumentation of 4200 Tons/Day Plant at Karachi. Line " G "
Complete Project on E & I
(054)
FWQ Enterprises (Pvt.) Ltd.
Liquid Cargo Terminal On BOT Basis
At Port Qasim
Intallation of 200M Cable Tray. Installation of 52 Nos. of Poles of 11M Height Complete Earthing including Earth rods and ECP

(053)

Jamshoro Joint Venture
(LPG Extraction Plant)
PLC Based Emergency Shutdown
System for Storage Tanks
Complete Installation and
Commissioning of ESD System including installation of Control Valves, Level, Switches, PLC Panel and controlling from 200 M away through HMI Software
(052)
Habib Sugar Mills
Nawabshah
Operational Supervision Contract
on Annual Basis
Complete Advisory Services for smooth operation of Plant 8400 Tons / Day
(051)
ABB Pakistan
Change of Excitation Panels
Progressive Changing of all Exicitation Panels for Turbo Alternator
(050)
Kohat Cement Limited
Electrical / Instrumentation
Installation Activities at Cement
Project at Kohat.
Complete Electrical / Instrument. Installation Activities of 1 x 6700
Ton Per day Production
(049)
Dewan Cement Limited
Electrical / Instrumentation
Installation Activities at Extension
Project in Karachi.
Complete Electrical / Instrument. Installation Activities of 1 x 2500
Ton Per day Production
(048)
M.A Corporation
KESC Sub Station Job
Bowling Alley in DHA.
(047)
Lucky Cement Limited
Complete Electrical / Instrumentation of 8400 Tons/Day Plant at Karachi. Line E & F
Complete Project on E & I
(046)
Lucky Cement Limited Complete Electrical / Instrumentation of 3300 Tons/Day Plant at Pezu Line 'D'
Complete Project on E & I
(045)
Universal Board & Industries
Electrical Work for 15 MW
Coal Firing Power Plant
Complete Electrical Installation
(044)
Lucky Cement Limited Complete Electrical / Instrumentation of 3300 Tons/Day Plant at Pezu Line 'C'
Complete Project on E & I
(043)
Pakistan State Oil
Rehabilitation of Electrical System
at Sanghi depot.
Electrical Upgrading
(042)
Shah Murad Sugar Mill
Consultancy and Supervision
at Distillary Plant.
Consultancy and Complete Supervision of the Installation and Commissioning Activities
at Distillary Plant
(041)
Attock Cement
Coal Firing System
Installition Testing and
Commissioning of Coal Firing System (E&I Job)
(040)
Pakistan State Oil
Telephone PABX at Tarujaba
Installation, Testing & Commissioning of PABX
(039)
Pakistan State Oil (ZOT)
Supply and Installation of
explosion proof lights
S/FX 16Nos. Explosion proof lights at ZOT
(038)
SCO
Earthing and Power Supply
Equipment
Complete earthing network and Power Supply Equipment
24 Exchanges in Northern Areas from Gilgit to Khunjrab.
(037)
Lucky Cement Limited
Coal Firing System
Installition Testing and
Commissioning of Coal Firing System for 2x2400 Ton Cement Plant ( E & I Jobs )
(036)
Pakistan State Oil
Pipri Marshalling Yard
Flood lights for Tank Farm Area
Flood Lights Installation
Quantity 200 Nos.

(035)

Pakistan State Oil
Complete Electrical Installation work of Pumping House Upgradation
Sub-Station Equipment MCCS, Pumps, Flood lights, Telephone / PA System
(034)
Pakistan State Oil
Tank Lorry Filling System
Complete automatic system of pump controls tank lorey filling at ZOT and Chakpirana Oil handling Facility
(033)
AL Noor MDFB
Complete Automation and
Visualization project.
Software development on Siemens S7 Step7 and WinCC System with 500 I/O's
(032)
Dadabhoy Energy Supply
Company
6.3 KV O/H Line
Complete job of Power Plant
from Power House to Cement
Plant.
(031)
Essa Cement Industries
6.3 KV O/H Line
Double Circuit 2.5Km.
(030)
Dadabhoy Energy Supply
Company
Installation of H.F.O. Power Plant
15.2 MW
Complete Electrical/ Instrumentation Job
(029)
National Technical Services
Electrical / Instrumentation
Installation at water tretment plant-Sui
Complete Electrical / Inst.
(028)
Essa Cement Industries
Electrical / Instrumentation
Installation activities in 1000 tons/day
Extension Project
Complete Electrical /
Instrumentation / Lighting
work from Raw Mill to Clinker Transport
(027)
Rif International
Installation of External Electrification
External Electrification Job
(026)
ICI Pakistan Limited
Annual Maintenance Contract
Complete Electrical Work of
Office Establishment
(025)
Tharparkar Sugar Mills.
Commissioning of 2x2.75 MW
Steam Turbo Alternaors.

- PLC based Steam turbine
Controller.
- Paralleling of 2.7 MW Altern.
- Load sharing devices.
- GES- ALATHOM protection
devices
- Battery Chargers.
- M.C.C.

(024)
PPL Kewali Pumping Station Kashmore.
Commissioning of 2x3.5 MW HFO/ Gas Fired. GE - ALSTROM Engines
- PLC based Engines Controller GE - ALSTROM.
( E&I Job)
(023)
Friendship Power
Synchronizing of Generators
Synchronizing of 3 Nos. Diesel
Generators 3 MW Capacity.
(022)
Zarak Textile Mills.
Installation/Testing/Commissioning
of Power House.
1 x 750 KW DG Set
2 x 750 KW Gas Gen. Sets.
( E&I Job)
(021)
Lucky Cement Ltd.
External Electrification of Complete
Plant.
Supply and Installation of Over 600 steel tubular poles along with related cabling and earthing.
(020)
Lucky Cement Ltd.
Internal Electrification of Power
House - 45 MW
Electrification, Fire Alarm
and Telephone System.
(019)
Allwin Engineering Industries
Modification of Power Distribution
System.
Complete modification in
Distribution Network including
Insertion of MV Panels in existing Bus Bar.
(018)
Allwin Engineering Industries
Installation of 2.5 MW Power House
3 Gas Generators alongwith
related switchgear. Complete Project
(017)
Saita Pakistan
Repair Of Alternator
Repairing of 650 KVA 400v,60 Hz Alternator Make : Platner France
(016)
Hinopak Motor Ltd.
Repairing of Power Factor
Improvement Plant - 750 KVAR.
Replacement of defective parts
and maintenance of sub-
station equipments
(015)
Central Telephone
Exchange
Rectification of fault in 500 KVA
D.G. Set.
Replacement of defective parts & trouble shooting
(014)
National Fibres Limited
Power Supply to Two-For-One Twister Project : 53119
Manufacturing of 04 Nos. Power DBs 04 Nos.Lighting DBs
(013)
Lever Brothers
Ice Cream Factory
Installation of 3000 KVA Diesel Power House
Complete Job of Power House at their "Walls" Ice Cream Factory in Lahore.
(012)
Saadi Cement Limited
Haripur Hazara
Testing of soil Resistivity
Testing of soil Resisitivity
at plant site - Haripur Hazara
(011)
First Textile Mills Ltd.
Repair Of Electronic Cards.
Repair of Picanol Cards
(010)
Central Telephone
Exchange
Rectification of fault in 60V, 200A Rectifier Panel.
Replacement of defective
parts & troubleshooting.
(009)
Lever Brothers , Karachi.
Installation of 1250 KVA D.G. Set
Complete work of Power House in Margarine factory Karachi.
(008)
Engro Chemicals (Pak)
Limited
Study of Power Factor System
Study to suggest improvement & the cost impact in P.F. System.
(007)
Pakistan Telecommunication Corporation Supply, Installation &
Commissioning of 100 KVAR
PFI Plant
One Board with Auto Switching.
(006)
Atlas Honda Supply & Installation of P.F.
Relays
Complete job.
(005)
Zainab Panjwani Hospital Installation, testing, Commissioning
of 110 KVA D.G.Set.
Complete Work
(004)
Dadabhoy Cement Industries Consultancy for Self Generation Project of 4MVA Capacity
Working of finer details Meeting with supplier.
(003)
Dadabhoy Cement Industries
Checking of Protection System
of complete plant.
Complete M.V. Network
(002)
Sunlight Plywood Industries Modification in 15 KV Isolators
panels to convert them to
C.B. Panel with MOCB.
06 Panels
01 Incoming / outgoing
(001)
Sunlight Plywood Industries Conversion of 15 KV/400V 02 Nos. 2500 KVA Transformers
to 11 KV/400 V System.
02 Units.
 

 

 